Sub-Spaces
ACEGeneral Session — Main stage, IMAG screens 11×20, full A/V, lighting
BDFHJMeal room / Awards stage — 59 rounds (Sodexo), 16'×24'×24" riser, ADA ramp
IBasic Science / Science Track — 24'×8'×24" riser, theatre 316
GStaff Office — tables + chairs per floor plan
HallwayHall of Industry / Exhibitors — 20 tables w/ linen, 40 chairs, arches
Set Times
Thu 7:30 AMCall time — Karsen/Carra + CCF Team
Thu 9:00 AMLoad in all — Hyatt Loading Dock (approved 9AM–2PM)
Thu 10:00 AMGeneral Session (ACE) setup begins
Sat 6:00 AMBallroom I reset to rounds
Power
Two 480V / 400A drops — positions marked on ITE floor plan. Coordinate with SPCC before patching.